Content


Appendices

Appendix 2.1         Dredging Programme

Appendix 3.1         Laboratory Test Report on Elutriate Tests

Appendix 3.2         Water Quality Impact Assessment for Alternative Scenario

Appendix A3.1      Sediment Plume Model Results – Dry Season

Appendix A3.2      Sediment Plume Model Results – Wet Season

Appendix A3.3      Daily Average Sedimentation per square meter

Appendix 3.3         Tracer Concentration Plots for Different Dredger Location

Appendix 3.4         Ambient SS, DO, TIN and Unionized Ammonia at Selected EPD Routine Monitoring Locations

Appendix 3.5a      Modification of diffuser port of existing Tsing Yi submarine outfall

Appendix 3.5b      Input Parameters of the Outfall Model (Visual Plume) and Result Summary

Appendix 3.6         Sample of the Outfall Model (Visual Plume) Outputs

Appendix 3.7         Current Magnitudes and Directions in the Proximity of HATS Outfall

Appendix 3.8         Predicted Suspended Solids Elevations (Cumulative Impacts)

Appendix 3.9         Predicted Dissolved Oxygen and Total Inorganic Nitrogen Concentrations for Scenario 1-7

Appendix 3.10      Modelling Results the Scenario of 1500 m3/day Dredging at Source C only with Concurrent Projects

Appendix 3.11      Mixing Zone for Ammoniacal Nitrogen and Unionized Nitrogen

Appendix 3.12      Predicted Ammoniacal Nitrogen and UIA Concentrations

Appendix 3.13      Outline Dredging Plan